We're here to help...

Total Hire & Sales specialises in the hire and sales of building equipment, power tools and materials for the construction industry, from DIY tools to major building equipment.

Total Hire - Total Hire And Sales Sponsor Derby County Mascot Rammie

3 STEP COURSE SELECTOR:


Use the 3 step form below to select a course you are interested in, review the course details and then, if you wish, book a place with us. Alternatively call us on 01332 830399

1.Select

2.Review

3.Book

CDM 2015 Regulations
book now

CDM

Construction (Design and Management) Regulations 2015: 

These are the main set of regulations for managing the health, safety and welfare of construction projects.

On Monday 6 April 2015, the Construction (Design and Management) Regulations 2015 replaced the 2007 Regulations.

Where there is, or is expected to be, more than one contractor on a project:

  • http://www.hse.gov.uk/assets/v4-images/website/sprites/bullets.png); background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: 0px 0.7em; background-repeat: no-repeat;"> where the construction phase has not yet started and the client has not yet appointed a CDM co-ordinator, the client must appoint a principal designer as soon as practicable
  • http://www.hse.gov.uk/assets/v4-images/website/sprites/bullets.png); background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: 0px 0.7em; background-repeat: no-repeat;"> if the CDM co-ordinator has already been appointed the client must appoint a principal designer to replace the CDM co-ordinator by 6 October 2015, unless the project comes to an end before then
  • http://www.hse.gov.uk/assets/v4-images/website/sprites/bullets.png); background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: 0px 0.7em; background-repeat: no-repeat;"> in the period it takes to appoint the principal designer, the appointed CDM co-ordinator should comply with the duties contained in Schedule 4 of CDM 2015.  These reflect the duties placed on CDM co-ordinators under CDM 2007 rather than requiring CDM co-ordinators to act as principal designers, a role for which they may not be equipped

Other transitional arrangements are:

  • http://www.hse.gov.uk/assets/v4-images/website/sprites/bullets.png); background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: 0px 0.7em; background-repeat: no-repeat;"> pre-construction information, construction phase plans or health and safety files provided under CDM 2007 are recognised as meeting the equivalent requirements in CDM 2015
  • http://www.hse.gov.uk/assets/v4-images/website/sprites/bullets.png); background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: 0px 0.7em; background-repeat: no-repeat;"> any project notified under CDM 2007 is recognised as a notification under CDM 2015
  • http://www.hse.gov.uk/assets/v4-images/website/sprites/bullets.png); background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: 0px 0.7em; background-repeat: no-repeat;"> a principal contractor appointed under CDM 2007 will be considered to be a principal contractor under CDM 2015

Dates Available

tbc - Book now

Training Centre

Training Centre

819 London Road

Alvaston

Derby


 

DE24 8UU

Tel: 01332 830399
Fax:

Google Map Us

CALL US NOW: 01332 830399

Training News

CITB:  We now run a variety of courses throughout the year at our Derby Centre. Other locations please enquire.

 

IPAF/PASMA:  We run these daily so if you dont see a date please enquire for extra dates to suit or on-site training.

 

Please call our training centre for details:  

T: 01332 830399  

E:t.(JavaScript must be enabled to view this email address)